| Here are some pictures of the detailed construction for the month of May 2004. I want to document my progress and get feedback from anyone out there on the construction. Quite a bit of the model has been built so far. I know there are some problems with it and will try to correct them as i go. |
![]() |
| Levels 1 and 2 |
![]() |
| Levels 1. One of my original pics showed the shack at the first level. I
need to do a little research to see if it is really there now and what the
actual dimensions are. I also have level 1 with the wrong height. I have it at 20 feet and it should be taller. |
![]() |
| Levels 2 showing the forst pass at new elevators. They were upgraded around
1989. So i decided to make them look like the new ones. |
![]() |
| A side shot of the elevator showing a cable tray. |
![]() |
| A Back view of the elevator shaft showing the stairs |
![]() |
| Another shot of the elevators on level 2 |
![]() |
| Levels 2-4 from the back showing the stairs cable trays and elevator sides.
these levels are starting to look a little better. Going to be adding the floor
underside details next. The the fiber optic lighting. |
![]() |
| Levels 2-4 |
![]() |
| Levels 2-4 |
![]() |
| A view of the real elevators before completion |
![]() |
| The floor plan for the elevators on the FSS |
![]() |
| A shot of the support structure for the weather protection system |
![]() |
| A shot of the support structure for the weather protection system |
![]() |
| Another shot of theweather protection system |
![]() |
| 05/31/04 - Levels 1-4 are just about complete now |
![]() |
| 05/31/04 - Levels 1-4 are just about complete now |
![]() |
| 05/31/04 - Levels 1-4 are just about complete now |
![]() |
| 05/31/04 - Levels 1-4 are just about complete now |