Here are some pictures of the detailed construction for the month of May 2004. I want to document my progress and get feedback from anyone out there on the construction. Quite a bit of the model has been built so far. I know there are some problems with it and will try to correct them as i go.


fss
Levels 1 and 2
fss
Levels 1. One of my original pics showed the shack at the first level. I need to do a little research to see if it is really there now and what the actual dimensions are.
I also have level 1 with the wrong height. I have it at 20 feet and it should be taller.
fss
Levels 2 showing the forst pass at new elevators. They were upgraded around 1989. So i decided to make them look like the new ones.
fss
A side shot of the elevator showing a cable tray.
fss
A Back view of the elevator shaft showing the stairs
fss
Another shot of the elevators on level 2
fss
Levels 2-4 from the back showing the stairs cable trays and elevator sides. these levels are starting to look a little better. Going to be adding the floor underside details next. The the fiber optic lighting.
fss
Levels 2-4
fss
Levels 2-4
fss
A view of the real elevators before completion
fss
The floor plan for the elevators on the FSS
fss
A shot of the support structure for the weather protection system
fss
A shot of the support structure for the weather protection system
fss
Another shot of theweather protection system
fss
05/31/04 - Levels 1-4 are just about complete now
fss
05/31/04 - Levels 1-4 are just about complete now
fss
05/31/04 - Levels 1-4 are just about complete now
fss
05/31/04 - Levels 1-4 are just about complete now