| Home | Overview | My Complex | Progress | Modelers Page | Real Thing | Links | Guestbook |
| Here are some pictures of the detailed construction for the month of September 2004. |
![]() |
| 09/01/04 - I decided i had to redo the hydrogen vent arm also. Here is the
new one during construction. |
![]() |
| 09/04/04 - The new vent arm |
![]() |
| 09/04/04 - The new vent arm |
![]() |
| 09/04/04 - The new vent arm Mounted in position |
![]() |
| 09/04/04 - The new vent arm Mounted in position |
![]() |
| 09/04/04 - The new vent arm Mounted in position |
![]() |
| 09/04/04 - The new vent arm Mounted in position |
![]() |
| 09/04/04 - The new vent arm mounted in the up position |
![]() |
| 09/11/04 - Progress on the Emergency Egress System |
![]() |
| 09/11/04 - Progress on the Emergency Egress System |
![]() |
| 09/11/04 - Progress on the Emergency Egress System |
![]() |
| 09/11/04 - The whole FSS. Still needs a few things to complete but i'm just
about done with it. Have to do the railings and the floor bracing and the rest
of the level braces, the piping, cameras. Ohhh the list never ends. Next I'll
move on to the RSS. I'm really looking forward to that one. |
![]() |
| 09/11/04 - The whole FSS. Still needs a few things to complete but i'm just
about done with it. Have to do the railings and the floor bracing and the rest
of the level braces, the piping, cameras. Ohhh the list never ends. Next I'll
move on to the RSS. I'm really looking forward to that one. |
![]() |
| 09/19/04 - I had to redo some of the features of the hammerhead crane. When
I first made it i made the bottom solid. It is actually a girder structure
except for the catwalk area which is actually steel grate. |
![]() |
| 09/19/04 - I had to redo some of the features of the hammerhead crane. When
I first made it i made the bottom solid. It is actually a girder structure
except for the catwalk area which is actually steel grate. |
![]() |
| 09/19/04 - I had to redo some of the features of the hammerhead crane. When
I first made it i made the bottom solid. It is actually a girder structure
except for the catwalk area which is actually steel grate. |
![]() |
| 09/19/04 - I had to redo some of the features of the hammerhead crane. When
I first made it i made the bottom solid. It is actually a girder structure
except for the catwalk area which is actually steel grate. |
![]() |
| 09/19/04 - Here it is mounted. It's not perfect...but it will do. |
![]() |
| 09/19/04 - Here it is mounted. It's not perfect...but it will do. |
![]() |
| 09/19/04 - Here it is mounted. It's not perfect...but it will do. |
![]() |
| 09/19/04 - A head-on view. |
| 09/29/04 - This is the original SRB Flame Hole in the MLP. I did a really
bad job on the original holes so I started to redo them. THe next set of photos
will show the progress on the new holes. Besides the bottom only being half
cut, the styrene was a little to thin to support the weight of the Shuttle
stack. Also the SRB overpressure water pipes were not up to specs. Forgot the
downpipe that goes to the tank plus i didnt make it 36". And the SRB posts
are in the wrong shape and dont extend all the way down the flame hole. I think
it will look a lot better this time. I also need to do the Water blankets the
go over the SRB holes. |
![]() |
| 09/29/04 - Here is the start of the new ones. |
![]() |
| 09/29/04 - Here is the second one before firring the plastic. You can see
the wood inner support structure i had to use to make the thing sturdy. |
![]() |
| 09/29/04 - From the bottom the flame hole completed. Just need to add the
details to it. I had to make that bottom plate due to the fact i'd never cur
the bottom of the MLP to match the top hole. |
![]() |
| 09/29/04 - The Bottom unfinished. I originally used Acrylic sheet for the
bottom...You can see it glued to the wood structure. I overlayed it with
1/8" styrene to do the raised (or sunken) part of the bottom of the
MLP. |
![]() |
| 09/30/04 - Here is the first SRB Holddown Mount. These are inside the Flame
Hole for the SRB. On top of these will go the SRB conical holddown posts. |
![]() |
| 09/30/04 - Here is the first SRB Holddown Mount mounted in the hole. These
are inside the Flame Hole for the SRB. On top of these will go the SRB conical
holddown posts. |
![]() |
| 09/30/04 - One side all done with the holddown mounts. |
| | Home |
Overview | My Complex
| |