Progress on the project
  Home Overview My Complex Progress Modelers Page Real Thing Links Guestbook

Here are some pictures of the detailed construction for the month of October 2004.


SRB Flame Hole
10/11/04 - Looking down into the SRB Flame Hole with all the bracing installed
SRB Flame Hole
10/11/04 - A Side view of the SRB Flame Hole
SRB Flame Hole
10/11/04 - One of the ladders that goes down to the SRB holddown post.
SRB Flame Hole
10/11/04 - A start of some of the piping for the sound suppression system.
SRB Flame Hole
10/12/04 - A start of some of the piping for the sound suppression system.
SRB Flame Hole
10/12/04 - Here is one of the water bags for the Flame Hole. The real ones are made of a plastic fabric but that was to hard to do at this scale.
SRB Flame Hole
10/12/04 - The water bag installed.
SRB Flame Hole
10/12/04 - Here are the SRB holddown posts. One problem i created is the downpipes are a little close to the SRB skirt but i'll have to live with it. Don't feel like doing it all over again.
SRB Flame Hole
10/12/04 - A view of the water pipes almst completed
SRB Flame Hole
10/12/04 - and another
SRB Flame Hole
10/12/04 - A headon view
SRB Flame Hole
10/13/04 - Looking a little better
SRB Flame Hole
10/13/04 - A test fit with the SRB
SRB Flame Hole
10/13/04 - A test fit with the SRB. Little tight....but it will do
Launch Complex
10/18/04 - A test fit of the whole complex....need to do some work on the RSS now that I completed the FSS. Its getting tough to work on. Everytime I move something i break somethig else. I have also started the platform for this whole thing. I originally wanted to make it the whole pad but the scale is to large it would be like 8 feet wide. So I think I am just going to have to settle for a small platform do a partial flame pit. making the flame pit to scale will have it at about 8" high. I'll have to see how it looks. Oh well the problems of a modeler.
Launch Complex
10/18/04 - A test fit of the whole complex....need to do some work on the RSS now that I completed the FSS.
Launch Complex
10/18/04 - A test fit of the whole complex....need to do some work on the RSS now that I completed the FSS.
Launch Complex
10/18/04 - A test fit of the whole complex....need to do some work on the RSS now that I completed the FSS. OK OK I know there is a little problem with the top of the ET. I used a piece of it to make the LOX vent arm top.
Launch Complex
10/18/04 - A test fit of the whole complex....need to do some work on the RSS now that I completed the FSS.
Launch Complex
10/18/04 - A test fit of the whole complex....need to do some work on the RSS now that I completed the FSS.
Launch Complex
10/18/04 - A test fit of the whole complex....need to do some work on the RSS now that I completed the FSS.