| 10/11/04 - Looking down into the SRB Flame Hole with all the bracing
installed |
![]() |
| 10/11/04 - A Side view of the SRB Flame Hole |
![]() |
| 10/11/04 - One of the ladders that goes down to the SRB holddown post. |
![]() |
| 10/11/04 - A start of some of the piping for the sound suppression
system. |
![]() |
| 10/12/04 - A start of some of the piping for the sound suppression
system. |
![]() |
| 10/12/04 - Here is one of the water bags for the Flame Hole. The real ones
are made of a plastic fabric but that was to hard to do at this scale. |
![]() |
| 10/12/04 - The water bag installed. |
![]() |
| 10/12/04 - Here are the SRB holddown posts. One problem i created is the
downpipes are a little close to the SRB skirt but i'll have to live with it.
Don't feel like doing it all over again. |
![]() |
| 10/12/04 - A view of the water pipes almst completed |
![]() |
| 10/12/04 - and another |
![]() |
| 10/12/04 - A headon view |
![]() |
| 10/13/04 - Looking a little better |
![]() |
| 10/13/04 - A test fit with the SRB |
![]() |
| 10/13/04 - A test fit with the SRB. Little tight....but it will do |
![]() |
| 10/18/04 - A test fit of the whole complex....need to do some work on the
RSS now that I completed the FSS. Its getting tough to work on. Everytime I
move something i break somethig else. I have also started the platform for this
whole thing. I originally wanted to make it the whole pad but the scale is to
large it would be like 8 feet wide. So I think I am just going to have to
settle for a small platform do a partial flame pit. making the flame pit to
scale will have it at about 8" high. I'll have to see how it looks. Oh
well the problems of a modeler. |
![]() |
| 10/18/04 - A test fit of the whole complex....need to do some work on the
RSS now that I completed the FSS. |
![]() |
| 10/18/04 - A test fit of the whole complex....need to do some work on the
RSS now that I completed the FSS. |
![]() |
| 10/18/04 - A test fit of the whole complex....need to do some work on the
RSS now that I completed the FSS. OK OK I know there is a little problem with
the top of the ET. I used a piece of it to make the LOX vent arm top. |
![]() |
| 10/18/04 - A test fit of the whole complex....need to do some work on the
RSS now that I completed the FSS. |
![]() |
| 10/18/04 - A test fit of the whole complex....need to do some work on the
RSS now that I completed the FSS. |
![]() |
| 10/18/04 - A test fit of the whole complex....need to do some work on the
RSS now that I completed the FSS. |