Progress on the project
  Home Overview My Complex Progress Modelers Page Real Thing Links Guestbook

Here are some pictures of the detailed construction for the month of November 2004.


Rotating Service Structure
11/12/04 - Well it was time to tackle the RSS. I started out by removing everything i did on one side. I'm going to reconstruct it from the tubular space frame out. I needed something to do for the winter. Maybe i can get it to look a little better. I know i'm crazy.
Rotating Service Structure
11/12/04 - The construction debris from the right side.
Midbody Umbilical Unit
11/14/04 - I had to redo the Midbody Umbilical Unit. The old one was really undersized as you can see from the pic above.
Midbody Umbilical Unit
11/14/04 - The Midbody Umbilical Unit.
Midbody Umbilical Unit
11/14/04 - The Midbody Umbilical Unit.
Midbody Umbilical Unit
11/14/04 - The Midbody Umbilical Unit mounted on the RSS
Midbody Umbilical Unit
11/14/04 - The Midbody Umbilical Unit mounted on the RSS
Rotating Service Structure
11/15/04 - The right side of the RSS showing some of the levels
Rotating Service Structure
11/15/04 - The right side of the RSS showing some of the levels
Rotating Service Structure
11/15/04 - The right side of the RSS showing some of the levels
Rotating Service Structure
11/16/04 - A test fit of the RSS and the FSS. I needed to see where are the walkways will go. Have to move a couple of the FSS....damn but overall it's starting to fit together pretty good.
Rotating Service Structure
11/16/04 - A test fit of the RSS and the FSS. I needed to see where are the walkways will go. Have to move a couple of the FSS....damn
Rotating Service Structure
11/21/04 - Added some of the cable trays on the rss
Rotating Service Structure
11/21/04 - Added some of the cable trays on the rss
Rotating Service Structure
11/24/04 - More and more detail
Rotating Service Structure
11/21/04 - Moe cable trays on the top of the RSS